NEW STEP BY STEP MAP FOR ATS AISIKAI

New Step by Step Map For ATS AISIKAI

New Step by Step Map For ATS AISIKAI

Blog Article

Cho phép kết hợp với bộ hẹn giờ hoặc bộ điều khiển từ xa qua Wifi để vận hành hệ thống qua mạng Wifi, 3G.

With no obvious and specific wiring diagram, the chances of producing glitches or producing electrical hazards improve drastically.

Mount the Aisikai ATS inside a practical site in close proximity to the facility source along with the electrical panel. Ensure the ATS is securely mounted to the wall or surface, pursuing the company’s Guidelines. Depart adequate Area across the ATS for quick access for wiring and routine maintenance.

អាចរួមបញ្ចូលជាមួយកម្មវិធីកំណត់ម៉ោង ឧបករណ៍បញ្ជាពីចម្ងាយតាមរយៈ wifi ដើម្បីដំណើរការប្រព័ន្ធ

These options allow for For additional Sophisticated operation and customization of the ATS procedure to satisfy certain ability demands and preferences.

The crisis electricity generator connections are One more crucial A part of the ATS system. The diagram will clearly show the link in the generator towards the generator enter terminals on the ATS.

In summary, the Aisikai ATS wiring diagram delivers an overview with the connections associated with starting a backup electricity method.

Control Panel: The control panel would be the central part on the Aisikai ATS. It properties the Manage circuitry, observe screens, and person interface. It lets operators to watch the status of the power resources, Management settings, and accomplish guide transfers if required.

Với những tính năng và Helloệu suất vượt trội, ATS AiSIKAI là một lựa chọn tốt cho các hệ thống điện có yêu cầu cao về độ tin cậy và ổn định.

The standing indicators, like environmentally friendly and purple LEDs, are frequently A part of the ATS Management unit. The diagram will illustrate the connections of such indicators, making it possible for visual monitoring of your technique’s status.

Additionally, a wiring diagram aids in economical documentation and interaction amid group members, endorsing productive collaboration and streamlining undertaking timelines.

Protecting Devices: These units, such as circuit breakers and fuses, defend the system along with the electrical equipment from overloads and faults.

Management Switches and Sensors: These switches and sensors observe the status of the ability resources and initiate the transfer process when essential.

This informative article aims to offer an extensive overview of the Aisikai ATS wiring diagram, breaking down the different elements and connections included.

Primary Electric power Supply: This is certainly the main supply of click here power to the system and is often linked to the utility grid.

Report this page